Electrical Installation Condition Reports for rented and commercial property, PAT testing for appliances, and consumer unit upgrades — all by qualified electricians working to the 18th Edition wiring regulations.

The rules at a glance

Electrical safety law for landlords

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require every rented home to have a valid EICR, renewed at least every 5 years. Tenants get a copy within 28 days of the inspection (new tenants before moving in), and the local authority within 7 days on request. Remedial work for failed reports must be completed within 28 days — or sooner if the report says so.

Non-compliance carries civil penalties of up to £30,000 per breach — and councils can commission the remedial work themselves and bill the landlord. HMO licensing adds further electrical conditions on top.

Electrical services

Testing, certification and upgrades

EICR Certificate (Domestic)

A full condition report on the property's fixed electrical installation — consumer unit, wiring, sockets, switches and earthing — carried out by a qualified electrician and reported against the 18th Edition (BS 7671). Every observation is coded so you know exactly what must be fixed and what's merely advisory.

CodeMeaningWhat happens
C1Danger presentImmediate action — made safe on the day
C2Potentially dangerousRemedial work required within 28 days
FIFurther investigation neededTreated with the same urgency as C2
C3Improvement recommendedAdvisory only — report still passes
  • Satisfactory certificate valid for up to 5 years
  • Fixed quote for any remedial work, completed within the 28-day window
  • Copies formatted for tenants, agents and local authorities

Commercial EICR

Offices, shops, restaurants and industrial units need periodic inspection to satisfy the Electricity at Work Regulations 1989, insurers and lease terms. We test three-phase supplies and distribution boards, and schedule around trading hours so testing doesn't shut the business.

  • Single and three-phase installations, distribution boards and sub-mains
  • Out-of-hours testing available to avoid downtime
  • Reports accepted by insurers and landlords, with prioritised remedial schedules

PAT Testing

Portable Appliance Testing checks that plug-in electrical items — kettles, white goods, lamps, extension leads, office equipment — are safe to use. Each appliance gets a visual inspection plus instrument tests (earth continuity, insulation resistance and polarity), a pass/fail label, and an entry in your asset register.

Who needs it

  • Landlords letting furnished properties — evidence that supplied appliances are safe
  • HMO landlords, where licence conditions commonly require it
  • Businesses meeting their Electricity at Work Regulations duties

What you get

  • Itemised register of every appliance tested, with results
  • Pass labels with test date and retest due date
  • Failed items flagged with repair-or-replace advice
  • Per-appliance pricing that stays economical for large portfolios

Fuse Box (Consumer Unit) Installation

Old fuse boxes with rewirable fuses or no RCD protection are one of the most common causes of a failed EICR. We replace them with modern consumer units with RCBO protection on every circuit — so one fault no longer blacks out the whole property — certified and notified under Part P.

  • Modern metal consumer unit with RCBO or dual-RCD protection
  • Surge protection available — recommended under the 18th Edition
  • Electrical Installation Certificate issued, Building Regulations notified
  • Frequently the single upgrade that turns an unsatisfactory EICR into a pass

Common questions

Electrical questions, answered

How long does an EICR take?

Allow 2–4 hours for a typical house — the electrician needs access to the consumer unit and a sample of sockets and switches in every room. Power is switched off in stages during testing, so warn tenants or staff in advance.

My EICR was done before 2019 — is it still valid?

Only if any C1 and C2 defects it identified were completed. Reports from 2019 onwards must be to the 18th Edition. If in doubt, the safe and usually cheapest route is a fresh inspection — we can advise from a copy of the old report.

Does an HMO have extra electrical requirements?

Yes — licensed HMOs must supply the EICR to the local authority, and defects must be dealt with within the licensing timescales. See our HMO services for the full compliance picture.